These are selected disclosures and claims, with their scope retained. Vendor-reported deployments and vendor-cited forecasts are not independent fleet survival studies.
Reported deployment · published 1 Oct 2026
A100 generation
NVIDIA reports continued commercial A100 service and CoreWeave bookings extending through 2029.
Generation-level vendor report, not a unit commissioning cohort. It does not establish future reliability or profit.
Read the sourceForecast · published 1 Oct 2026
Eight-GPU H100 system
5 to 6 years estimated
NVIDIA cites Barkr estimating useful life for an eight-GPU H100 system.
A system-level estimate cited by the vendor. Not a guarantee for one H100 card or a measured failure distribution.
Read the sourceForecast · published 1 Oct 2026
GB300 NVL72 system
9 to 10 years estimated
NVIDIA cites Barkr estimating useful life for a GB300 NVL72 system.
A rack-scale forecast, not a completed service history. No individual GPU remaining-life estimate is inferred.
Read the sourceReported deployment · published 30 Sep 2026
CoreWeave V100 deployments
NVIDIA reports that CoreWeave V100 GPUs continue to run customer workloads.
A vendor statement about surviving deployments, without unit-level commissioning dates or failed-unit counts.
Read the sourceSoftware support · checked 4 Oct 2026
Volta architecture, including V100
CUDA Toolkit 13 removed offline compilation and library support for Maxwell, Pascal and Volta.
A toolchain support change. Existing compatible binaries and older toolkits are a separate question; this is not a physical failure date.
Read the sourceAccounting life · report period 31 Dec 2025
Alphabet servers and network equipment
6 years accounting assumption
Alphabet describes depreciation of servers and network equipment generally over six years.
Accounting estimate in the cited disclosure, not a GPU-specific survival or resale forecast.
Read the sourceAccounting life · effective 1 Jan 2025
A subset of Amazon servers and networking equipment
5 years accounting assumption
Amazon changed the estimated useful life of a subset from six years to five, effective January 2025.
The change applies to a subset and is historical disclosure, not a universal cloud-server lifespan.
Read the sourceFinancing · published 31 Mar 2026
CoreWeave DDTL 4.0 facility
CoreWeave disclosed a facility secured by infrastructure and an associated customer contract, with maturity in March 2032.
Financing maturity and contract credit are not evidence that an individual GPU remains productive through that date.
Read the sourceReported deployment · published 30 Sep 2026
CoreWeave Vera Rubin NVL72 systems
NVIDIA reports production racks received earlier in September and Cognition running production workloads, with early-access availability.
Reported deployment of a specific rack-scale system. It does not establish fleet survival or the release status of every Rubin-based GPU product.
Read the source